In posting the Juneau shore power study two days ago as part of our documentation and background regarding electrification of the Juneau docks for cruise ship emissions reductions, we called into question the study’s $13 million estimated bill…for one berth only.
These two articles from Canada show us that it is probable that we can electrify
our docks for a much lower cost than we’ve been told.
4 berths billed at $11 million or less than $3 milion each.
One Comment
Comments are closed.